How do you document a rework?

Prepare for the Re-Entry Control Supervisor Test. Study with flashcards, multiple choice questions, hints, and explanations. Get ready for your exam now!

Multiple Choice

How do you document a rework?

Explanation:
When documenting a rework, keep the original REC number intact and add a dash with a sequential suffix to denote the rework. The proper format is to append -1 (or -2, etc.) after the original number, as in 96-001-1 for the first rework of 96-001. This creates a direct link between the rework and its source, preserving the original record for traceability and making subsequent reworks easy to identify (96-001-2, and so on). Other approaches either move the entry to a different log or rely on notes outside the REC Log, which breaks linkage and clarity.

When documenting a rework, keep the original REC number intact and add a dash with a sequential suffix to denote the rework. The proper format is to append -1 (or -2, etc.) after the original number, as in 96-001-1 for the first rework of 96-001. This creates a direct link between the rework and its source, preserving the original record for traceability and making subsequent reworks easy to identify (96-001-2, and so on). Other approaches either move the entry to a different log or rely on notes outside the REC Log, which breaks linkage and clarity.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy